FICSIT // Gamerkuiper's Slug Hunt

0 Pioneers on shift

33 Pioneers on the payroll

Work order #5

Production Quota

ADA: Corporate requires 7.5 of Audit A-7's final product per minute. Using exactly the production report in Audit A-7, with every building at 100% clock and no partial buildings, how many of each building type does the factory need? Mining is handled by another department.

Production report A-7 · default recipes, 100% clock, per minute per building
Building Inputs per min Outputs per min Cycle
Manufacturer ▮A 10, ▮B 20, ▮C 40 ▮X 2.5 24 s
Assembler ▮D 15, ▮C 30 ▮A 7.5 8 s
Constructor ▮E 20 ▮D 10 6 s
Constructor ▮F 60 ▮B 30 2 s
Constructor ▮E 15 ▮F 30 4 s
Smelter ▮G 30 ▮E 30 2 s
Refinery ▮H 30 m³ ▮C 20, ▮I 10 m³ 6 s

Answer format: Manufacturers/Assemblers/Constructors/Smelters/Refineries

Enter the building counts.