Work order #4
Supply Audit A-7
ADA: An auditor redacted every item name in this production report before being reassigned to an asteroid. Buildings and rates were left intact.
The auditor's last note reads: '▮C is a supply risk.' FICSIT wants to know: what is ▮C?
| Building | Inputs per min | Outputs per min | Cycle |
|---|---|---|---|
| Manufacturer | ▮A 10, ▮B 20, ▮C 40 | ▮X 2.5 | 24 s |
| Assembler | ▮D 15, ▮C 30 | ▮A 7.5 | 8 s |
| Constructor | ▮E 20 | ▮D 10 | 6 s |
| Constructor | ▮F 60 | ▮B 30 | 2 s |
| Constructor | ▮E 15 | ▮F 30 | 4 s |
| Smelter | ▮G 30 | ▮E 30 | 2 s |
| Refinery | ▮H 30 m³ | ▮C 20, ▮I 10 m³ | 6 s |